A true auger bore that went as well as could ever be expected. The one challenging aspect of the project was the weight of the 36" - .875 wall casing utilized for the project. This heavy wall pipe and required welding standards created many hours of welding between pipe joints. The soils were very conducive to the method of design and proved that all things can go right with a well-planned project. ClearPath was a subcontractor for this bore and thanks to the prime contractor and their field personnel all aspects of the project clicked just right. The entire project from mobilization to demobilization took just 3 days.